Breaking News
BN and PAS to announce Melaka candidates tomorrow
MELAKA, Oct 23 — Barisan Nasional (BN) will announce its candidates for the Melaka State Election,
...Kuching international school beefs up security with three police officers after teacher attacked
KUCHING, Oct 22 — Tunku Putra-HELP (TPH) International School has confirmed that it will immediately enhance
...Civil servants effectively banned from using Waze app due to Israel ties
KUALA LUMPUR, Oct 21 — Civil servants have been banned from using the Waze navigation app with
...Govt looking at tougher penalties to tackle cable theft across public transport sector
KUALA LUMPUR, Oct 20 — The Transport Ministry is in the midst of drafting necessary measures
...Flood victim count at PPS records slight increase; Royal Malaysian Navy sends 100 personnel to Pangkor
IPOH, Oct 19 — A total of 156 flood victims from 50 families are seeking shelter
...Father and daughter killed as container crushes car in Sepanggar, police detain driver
KOTA KINABALU, Oct 19 — A 49-year-old trailer driver has been detained to assist investigations after
...
Fire erupts at Bintulu aluminium plant, second blaze within a month at Samalaju Industrial Park, all workers evacuated safely
BINTULU, Sept 10 — An aluminium processing plant in Samalaju Industrial Park, Bintulu, caught fire last night.
According to the Fire and Rescue Department (Bomba), only 10 per cent of the building, measuring 120 feet by 60 feet (36.5 metres by 18.2 metres), was destroyed by the fire.
Bomba said they were notified about the incident at 11.50pm and 26 firefighters, including a hazardous material (Hazmat) team from Samalaju and Bintulu fire stations, were deployed to the location.
“Upon arrival at the location, the operation commander reported a leak had occurred during molten aluminium process, as the material could not react with water. During the incident, it was raining and an explosion had occurred,” it said.
Bomba said no casualties were reported as all 61 workers were safely evacuated.
Bomba said the firefighting operation was delayed as the molten aluminium needed to cool down before the firefighters could begin their work.
The rain further complicated the situation, as it prevented the use of fire extinguishing powder, it added.
Bomba said the fire was completely extinguished at around 6.20am.
“The firefighters ended the operation after ensuring that the situation was safe and there were no remnants of fire at the scene.”

